Home
  • English
  • ÄŒeÅ¡tina
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • LatvieÅ¡u
  • Magyar
  • Nederlands
  • Português
  • Português do Brasil
  • Suomi
  • Log In
    New user? Click here to register. Have you forgotten your password?
Home
  • Browse Our Collections
  • Publications
  • Researchers
  • Research Data
  • Institutions
  • Statistics
    • English
    • ÄŒeÅ¡tina
    • Deutsch
    • Español
    • Français
    • Gàidhlig
    • LatvieÅ¡u
    • Magyar
    • Nederlands
    • Português
    • Português do Brasil
    • Suomi
    • Log In
      New user? Click here to register. Have you forgotten your password?
  1. Home
  2. Resources
  3. UniMAP Index Publications
  4. Publications 2021
  5. Risk evaluation on D power press operation report at D manufacturing company in Malaysia
 
Options

Risk evaluation on D power press operation report at D manufacturing company in Malaysia

Journal
AIP Conference Proceedings
ISSN
0094243X
Date Issued
2021-05-03
Author(s)
Mohd Fathullah Ghazli@Ghazali
Universiti Malaysia Perlis
Mohd Sazli Saad
Universiti Malaysia Perlis
Osman M.S.
Ling C.J.
Li F.H.
Yee L.S.
Lee M.J.
Shing S.C.
DOI
10.1063/5.0045238
Abstract
This paper reports a case study of accidents or incident analysis in the power press machine at a press machine area in a manufacturing company. Hazard identification, cause and effect, risk level and solutions was assessed. There are total of seven hazards identified in the power press machine. These seven hazards consist of six medium level of risk and one low level of risk respectively. These listed hazards in the workplace will directly affect the worker in the view of safety and health. However, there are some solutions regarding these hazards had been proposed. By carry out some discussion, certain solution is suggested to solve the hazard in the workplace. The suggested solution shown in the HIRARC analysis can be said as simple solution which the company can conduct it successfully. It can help to reduce or solve the hazards that will protect their workers well. This will also increase their worker's productivity and comfortability in work. Pareto analysis had shown clearly with the higher risk hazards consist in the workplace that can let the company to solve the hazards with priority according to the analysis shown. Pareto analysis will help to solve the problem effectively. All these solutions suggested will only take about 2 months to solve all the hazards.
File(s)
Research repository notification.pdf (4.4 MB)
google-scholar
Views
Downloads
  • About Us
  • Contact Us
  • Policies