Now showing 1 - 2 of 2
  • Publication
    Electrical tree image de-noising using threshold wavelet transform and wiener filter
    (Semarak Ilmu Publishing, 2025) ;
    Cik Siti Khadijah Abdulah
    ;
    Nur Dini Athirah Gazata
    ;
    Mohd Anuar Mohd Isa
    ;
    ;
    Mohamad Kamarol Jamil
    ;
    ;
    Firdaus Muhammad-Sukki
    ;
    Abdullahi A. Mas’ud
    ;
    Noor Syazwani Mansor
    Electrical treeing occurred in solid dielectric materials, especially in electrical application with high voltage. The occurrence of electrical tree happens when high electric fields applied, causing tiny channels or paths to form. The main issue during the data collection process is the changes of lighting, making it difficult to study the tree's propagation length, fractal dimension, and growth rate due to corrupted images. This research aims to analyse electrical tree structure images in XLPE material using a CCD camera and develop image de-noising techniques to suppress noise on the electrical tree image. The performance was then analysed using the Otsu thresholding algorithm for accurate segmentation. The methodology was divided into four phases: sample preparation, experimental setup, image pre-processing in MATLAB, and testing four de-noising filters: Wiener, median, NLM, and Gaussian. The Wiener filter with higher PSNR, SNR, and RMSE was selected and using superimposed method, both threshold wavelet transforms and wiener was combined to eliminate the noise. Finally, the proposed method of superimposed was tested with the Otsu thresholding method to evaluate accuracy, sensitivity, and specificity of the combination filter. Based on the analysis of PSNR, SNR, and RMSE, the performance of the threshold wavelet and Wiener filter (TWWF) de-noising technique improves the image quality of the electrical tree structure. Thus, for the Otsu thresholding segmentation algorithm analysis, it also had the highest values in terms of accuracy, sensitivity, and specificity.
      1  1
  • Publication
    Protection Relay Setting based on Overcurrent Phenomena in Commercial Building
    ( 2024-03-01)
    Isyraq Faizzi Mohammad
    ;
    ; ; ; ;
    Abdullahi Abubakar Mas’ud
    ;
    Firdaus Muhammad-Sukki
    Nowadays, every single distribution system needs to install an appropriate relay to keep the system safe. The operational and commonly recommended relay for distribution systems is the overcurrent (OC) relay. Throughout the distribution system, the protective relay is one of the methods that can detect and protect the location according to its observation from any fault from abnormal activity. Note that time coordination between the protective equipment relay needs to be a minimum of time interruption to prevent faults occurs. The ideal setting for all coordination protection relays is necessary to protect the device against electrical failure and interference. This paper analyzes the real results data collected for the selected commercial building of an OC relay implemented in a distribution board for high voltage and low voltage downward at a commercial building. All the parameters need to be clarified first before testing has been made and measurement is carried out using the MICROTEST 860 set. Based on the analysis, it proves that according to the IEC Standard of 0.10-time multiplier Setting (TMS) is practical to be used to obtain the operation time in seconds for the current curve set. Other than that, the results show that the normal inverse curve from manual calculation results is more accurate compared to the service setting (SS) made based on the incoming setting in a real commercial building. The case study for OC relay setting is related between current injection and time-tripping, which complies with the IEC 60255-3 standard using its formula. This method was applied to determine the characteristics of the curve. Hence, this research successfully determined the proper methods for the OC relay setting for the power distribution system. Besides, the feasibility and efficiency of OC relay data transmission are tested and checked successfully to implement the measurement method in the relay coordination study.
      1  33