Home
  • English
  • ÄŒeÅ¡tina
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • LatvieÅ¡u
  • Magyar
  • Nederlands
  • Português
  • Português do Brasil
  • Suomi
  • Log In
    New user? Click here to register. Have you forgotten your password?
Home
  • Browse Our Collections
  • Publications
  • Researchers
  • Research Data
  • Institutions
  • Statistics
    • English
    • ÄŒeÅ¡tina
    • Deutsch
    • Español
    • Français
    • Gàidhlig
    • LatvieÅ¡u
    • Magyar
    • Nederlands
    • Português
    • Português do Brasil
    • Suomi
    • Log In
      New user? Click here to register. Have you forgotten your password?
  1. Home
  2. Resources
  3. UniMAP Index Publications
  4. Publications 2019
  5. Dispatch strategy for grid-connected micro-wind turbine generators with battery: Case study in Malaysia
 
Options

Dispatch strategy for grid-connected micro-wind turbine generators with battery: Case study in Malaysia

Journal
Universal Journal of Electrical and Electronic Engineering
ISSN
23323280
Date Issued
2019-12-01
Author(s)
Suboh S.
Baharudin N.
Basheer O.
DOI
10.13189/ujeee.2019.061516
Handle (URI)
https://hdl.handle.net/20.500.14170/10612
Abstract
In recent years, Malaysian government has been searching for an opportunity to realize the first wind farm in Malaysia to achieve 20% penetration of renewable energy by 2025. Even though Malaysia experiences low average wind speed, but rapid advancement of micro-wind turbine technology promises a potential enhancement of wind harvesting in Malaysia in the near future. Concerning of high wind penetration to the grid, severe technical problems because of its fluctuating and intermittent nature will affect the power system stability. In view of that, this paper proposes a dispatch strategy for a wind farm comprising micro-wind turbine generators supported by a battery to minimize the fluctuation where for a monthly interval, a different value of reference power is followed. In parallel, the lower and upper constraints of battery state-of-charge must be satisfied. The proposed strategy is validated using the real wind data measured at Mersing, Malaysia. The results reveal that the proposed strategy successfully reduces the fluctuation and achieves the reference power for most of the intervals while ensuring the battery operates within a safe operating region. Using the simulation results, the payback period is estimated, which exposes that this project as an example, requires about 20 years of period to reimburse the capital expenditure.
Subjects
  • Battery | Dispatch st...

Thumbnail Image
google-scholar
Views
Downloads
  • About Us
  • Contact Us
  • Policies