Publication:
Non-Conformance Time As the Component of Time Loss Measures in Assembly Processes

cris.author.scopus-author-id 57195394283
cris.author.scopus-author-id 56650070800
cris.author.scopus-author-id 57222543244
cris.author.scopus-author-id 57208823927
cris.author.scopus-author-id 57204215093
dc.contributor.author Rasib A.H.A.
dc.contributor.author Abdullah R.
dc.contributor.author Parnon M.A.A.
dc.contributor.author Abdullah Z.
dc.contributor.author Mansoor H.O.
dc.date.accessioned 2024-09-27T04:20:38Z
dc.date.available 2024-09-27T04:20:38Z
dc.date.issued 2021-03-09
dc.description.abstract Hidden Time Loss (HTL) occurs along the production processes that have a big implication on productivity. Overall Equipment Efficiency (OEE) is one of the most popular performance measurement tool used in the production line. The HTL has been provided by quality as one of the measure components of OEE. However, OEE doesn't really suitable in measuring operation performance of assembly processes mainly in the semi-auto assembly and the manual assembly processes. There would be the amount of HTL have occurred along the semi-auto assembly and manual assembly processes that become crucial when to achieve high product variety at the same production assembly line. Therefore, the purpose of this paper is to introduce the Non-conformance Time (NCT) as one of the part of Hidden Time Loss Measures (HTLM) in assembly processes. Literature study on manufacturing assembly processes had been used to derive the structure of NCT. Then, two selected automotive manufacturing companies had been used as a case studies in order to validate the NCT structure. Based on semi-auto and manual assembly processes, the results show that the NCT is one of the parts of HTLM.
dc.identifier.doi 10.1088/1742-6596/1793/1/012074
dc.identifier.scopus 2-s2.0-85103078613
dc.identifier.uri https://hdl.handle.net/20.500.14170/4515
dc.relation.grantno undefined
dc.relation.ispartof Journal of Physics: Conference Series
dc.relation.ispartofseries Journal of Physics: Conference Series
dc.relation.issn 17426588
dc.rights open access
dc.subject Assembly Process | Non-conformance | Non-value Added | Performance Measure
dc.title Non-Conformance Time As the Component of Time Loss Measures in Assembly Processes
dc.type Conference Proceeding
dspace.entity.type Publication
oaire.citation.issue 1
oaire.citation.volume 1793
oairecerif.affiliation.orgunit Universiti Teknikal Malaysia Melaka
oairecerif.affiliation.orgunit Universiti Teknikal Malaysia Melaka
oairecerif.affiliation.orgunit Universiti Teknikal Malaysia Melaka
oairecerif.affiliation.orgunit Uptrend Engineering Sdn. Bhd
oairecerif.affiliation.orgunit University of Fallujah
oairecerif.citation.number 012074
person.identifier.orcid #PLACEHOLDER_PARENT_METADATA_VALUE#
person.identifier.orcid #PLACEHOLDER_PARENT_METADATA_VALUE#
person.identifier.orcid #PLACEHOLDER_PARENT_METADATA_VALUE#
person.identifier.orcid #PLACEHOLDER_PARENT_METADATA_VALUE#
person.identifier.orcid #PLACEHOLDER_PARENT_METADATA_VALUE#
person.identifier.scopus-author-id 57195394283
person.identifier.scopus-author-id 56650070800
person.identifier.scopus-author-id 57222543244
person.identifier.scopus-author-id 57208823927
person.identifier.scopus-author-id 57204215093
Files