Home
  • English
  • ÄŒeÅ¡tina
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • LatvieÅ¡u
  • Magyar
  • Nederlands
  • Português
  • Português do Brasil
  • Suomi
  • Log In
    New user? Click here to register. Have you forgotten your password?
Home
  • Browse Our Collections
  • Publications
  • Researchers
  • Research Data
  • Institutions
  • Statistics
    • English
    • ÄŒeÅ¡tina
    • Deutsch
    • Español
    • Français
    • Gàidhlig
    • LatvieÅ¡u
    • Magyar
    • Nederlands
    • Português
    • Português do Brasil
    • Suomi
    • Log In
      New user? Click here to register. Have you forgotten your password?
  1. Home
  2. Research Output and Publications
  3. Center of Excellence Geopolymer & Green Technology (CeGeoGTech)
  4. Conference Publications
  5. Content validity of construction quality management of industrialised building system (IBS) related project in Malaysia
 
Options

Content validity of construction quality management of industrialised building system (IBS) related project in Malaysia

Journal
AIP Conference Proceedings
ISSN
0094-243X
Date Issued
2020
Author(s)
Mohd Hafiz Zawawi
Universiti Malaysia Perlis
Nor Syahirah Azman
Universiti Tenaga Nasional
Mohd Zakwan Ramli
Universiti Tenaga Nasional
Nursyadzatul Tasnim Roslin
Universiti Tenaga Nasional
DOI
10.1063/5.0027056
Handle (URI)
https://pubs.aip.org/aip/acp/article-abstract/2291/1/020086/725006/Content-validity-of-construction-quality?redirectedFrom=fulltext
https://pubs.aip.org/aip/acp
https://hdl.handle.net/20.500.14170/14157
Abstract
Construction industry is one of the key players in developing a country. However, the industry is often plagued with the same problem which is maintaining the quality. Industrialized Building System (IBS) has been identified as a potential method to improve overall construction performance in term of quality, cost effectiveness, safety and health, waste reduction and productivity. This paper is to focus on highlighted the success factors and validate the content of an instrument for factors that affect the quality of construction projects in Malaysia. A panel of 37 experts was used to validate the instrument through Content Validity Index (CVI). It was found that the highest kappa coefficient value is 1.000 for item; 'Consideration for the selection and position of special equipment for the transportation and handling of IBS components', 'Site layout has storage areas for materials', and 'Comprehensible structure of process planning and control'.
File(s)
Content validity of construction quality management of industrialised building system related project in Malaysia.pdf (54.95 KB)
google-scholar
Views
Downloads
  • About Us
  • Contact Us
  • Policies