Home
  • English
  • ÄŒeÅ¡tina
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • LatvieÅ¡u
  • Magyar
  • Nederlands
  • Português
  • Português do Brasil
  • Suomi
  • Log In
    New user? Click here to register. Have you forgotten your password?
Home
  • Browse Our Collections
  • Publications
  • Researchers
  • Research Data
  • Institutions
  • Statistics
    • English
    • ÄŒeÅ¡tina
    • Deutsch
    • Español
    • Français
    • Gàidhlig
    • LatvieÅ¡u
    • Magyar
    • Nederlands
    • Português
    • Português do Brasil
    • Suomi
    • Log In
      New user? Click here to register. Have you forgotten your password?
  1. Home
  2. Resources
  3. UniMAP Index Publications
  4. Publications 2023
  5. Building Information Modelling (BIM) Application as Risk Mitigation Strategies in Building Refurbishment Project Life Cycle
 
Options

Building Information Modelling (BIM) Application as Risk Mitigation Strategies in Building Refurbishment Project Life Cycle

Journal
IOP Conference Series: Earth and Environmental Science
ISSN
17551307
Date Issued
2023-01-01
Author(s)
Nurfadzillah Ishak
Universiti Malaysia Perlis
Muhammad Azizi Azizan
Universiti Malaysia Perlis
Fazdliel Aswad Ibrahim
Universiti Malaysia Perlis
Nur Soleha Abdul Rahim
Universiti Malaysia Perlis
Zawawi E.M.A.
Anuar N.H.K.
Shohime N.S.
DOI
10.1088/1755-1315/1216/1/012030
Handle (URI)
https://hdl.handle.net/20.500.14170/4659
Abstract
Towards the implementation of inclusive sustainable cities development as one of the Sustainable Development Goals, the imbalance ratio of existing buildings to new construction became overwhelming challenges. Therefore, refurbishment of existing buildings is considered the possible solution to minimizes the environmental impact and upgrading the performance of an existing building to meet new requirements. However, building refurbishment is well-known as a project that comprehends riskier compared to new building projects which lead to limited applicability in current risk management implementation. Thus, in line with an era of digitization construction of the fourth industrial revolution (IR 4.0), the traditional risk management needs improvement from a manual basis to magnifying efficiency using integration of Building Information Modelling (BIM) application. BIM is defined as an advanced technology that assists construction players to produce, communicate, and analyse building models by providing visual tools and a set of data. Therefore, the objective of this research is to identify the potential building refurbishment risk categories and to determine the most critical project lifecycle phase in implementing the BIM applications in order to mitigate the potential building refurbishment project risk. Also, to discover the relationship strength between these two variables. The quantitative method is applied by using a questionnaire form to the certified BIM experts. This research contributes a solid understanding and useful guideline for future practice reference and improvement within the Building Refurbishment Project.
File(s)
research repository notification.pdf (4.4 MB)
Views
3
Last Month
1
Acquisition Date
Mar 5, 2026
View Details
Downloads
26
Last Month
1
Acquisition Date
Mar 5, 2026
View Details
google-scholar
  • About Us
  • Contact Us
  • Policies