Home
  • English
  • ÄŒeÅ¡tina
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • LatvieÅ¡u
  • Magyar
  • Nederlands
  • Português
  • Português do Brasil
  • Suomi
  • Log In
    New user? Click here to register. Have you forgotten your password?
Home
  • Browse Our Collections
  • Publications
  • Researchers
  • Research Data
  • Institutions
  • Statistics
    • English
    • ÄŒeÅ¡tina
    • Deutsch
    • Español
    • Français
    • Gàidhlig
    • LatvieÅ¡u
    • Magyar
    • Nederlands
    • Português
    • Português do Brasil
    • Suomi
    • Log In
      New user? Click here to register. Have you forgotten your password?
  1. Home
  2. Resources
  3. UniMAP Index Publications
  4. Publications 2023
  5. Building Information System (BIM) as Analyzing Tool Measuring Railway Project Progression
 
Options

Building Information System (BIM) as Analyzing Tool Measuring Railway Project Progression

Journal
AIP Conference Proceedings
ISSN
0094243X
Date Issued
2023-10-04
Author(s)
Norsyakilah Romeli
Universiti Malaysia Perlis
Nurfadzillah Ishak
Universiti Malaysia Perlis
Nur Soleha Abdul Rahim
Universiti Malaysia Perlis
Amin R.M.
Aizat Afiq A.G.M.
DOI
10.1063/5.0133051
Abstract
The diversities of contractual terms in construction projects leads to a diversified contractual interpretation in one project. In the long term, the contractual discrepancies would resulted the project suffered from the unwavering disputes. Given the circumstances of site valuation, which refers to the evaluation on the quantity of the building feature was hardly to be quantified in the exact amount based on contractor’s work done. Often, the site evaluation dissatisfactions occurred when the quantity elements in the railway construction has been over claimed by the contractor due to accuracy onsite inspection. The mega structure construction projects have the complicated site inspection and real time measuring tabulation. As fatality increase on site, due to risking human life on the field. The safety culture in mega structure construction has been considered taken lightly. Recently, the advance technology has offered new whole idea in implementing site measurement without risking man, which is using the application of technology that enable Building Information Modelling (BIM) as analyzing tool to process as built drawing. Thus, this research aims to identify the effectiveness utilization of Building Information Modelling (BIM) in measuring real time in railway construction industry.
Funding(s)
Lloyd's Register
File(s)
research repository notification.pdf (4.4 MB)