Hybrid System Methods in Industrialised Building Systems (IBS): A Structural Compatibility Study
Journal
Journal of Advanced Research in Applied Sciences and Engineering Technology
Date Issued
2024-11-01
Author(s)
Azmin I.
Umar Kassim
Universiti Malaysia Perlis
Sinar Arzuria Adnan
Universiti Malaysia Perlis
Universiti Malaysia Perlis
Siti Nurul Aqmariah Mohd Kanafiah
Universiti Malaysia Perlis
Yusoff M.N.
Abd Razak S.M.S.
Ilpandari I.
DOI
10.37934/araset.41.2.8292
Handle (URI)
Abstract
Hybrid System in Industrialised Building System (IBS) is combining IBS components with conventional method. Delay has become a familiar issue in construction field. The issues pertaining structure stability when using this combination method leads to delay while installing these two different method components. The combination also could cause a defect jointing. In Industrialised Building System (IBS), even though it is one of the technology methods that can save times, cost, and reduce labour in construction, but there still have constraints such as design issues, lack of experienced worker, and internal and external issues that can affect cost problems. In this study, the suitability structure based on combination method is investigated to discover the affected factors of suitability structure by using Hybrid System which is the aim of this study. The data analysis from quantitative survey shows that the top three affecting the building structure are: 1) weather effects with highest mean of 6.25 followed by 2) delay of jointing process at 6.03 and 3) defects from monolithic jointing at 5.93. Therefore, the amount of average data obtained shows that the most affected structure is the Hybrid System.